A modern indoor atrium with high ceilings, featuring a curved, wooden staircase and natural light streaming through upper windows, is an architectural highlight often seen in the Trillium Lakehead District School Board.

Town of Bracebridge Trillium Lakehead District School Board

Joint-use complex with a 1,100-student, 160,000 sq.ft secondary school and a 60,000 sq.ft Recreation Complex. The Recreation Complex includes a 300 seat theatre, a leisure pool, a 25m lap pool, multi-purpose rooms, gymnastics centre, indoor track and climbing wall. The two-storey school is arranged around two courtyard spaces to provide generous daylighting to all of…

Aerial view of a building surrounded by parking lots, with a track field in the background, part of the York Region Education landscape.

York Region Board of Education

This project replaced an existing outdated high school and provided a new community theatre. The community theatre, situated on the new site, minimizes the impact to adjoining conservation areas while maximizing the exposure to the local residential neighbourhood. Location of the theatre also allows interconnection for use, circulation and program sharing.  Academic programs can be…

Modern building with trees in front and a York House School sign that reads "4176 Alexandra St.

York House School

This project entailed the design and construction of a new three-storey concrete senior school and administration block, as an addition to the existing school. The new building was constructed between the existing North and South wings. Mechanical Systems Description: MCW provided designs for the HVAC and plumbing systems. The fire protection designs were based on…

Exterior view of Burnaby Central Secondary School in School District 41. The modern building features large windows and an overhang with glass panels supported by metal beams.

School District 41

This secondary school boasts a number of sustainable features, including increased energy efficiency (40% over Code), a geoexchange closed loop heating/ cooling system, a weather-regulated irrigation system, durable construction, recycled and regional materials, construction waste management, riparian area restoration, and water-efficient plumbing. Mechanical Systems Description: MCW designed the plumbing and school ventilation and make-up air…

A modern building with a glass entrance, white structural beams, and sun shining above, casting shadows on the exterior walls serves as an emblematic structure for School District 43.

School District 43

This unique three-storey school is built into steep terrain. The school includes 18 classrooms, a daycare, a performing arts room, an industrial arts room, a home economics room, and a gymnasium on the lowest level. Mechanical Systems Description: The mechanical designs are based on myriad sustainable principles, and feature a number of systems for displacement…

Modern building with large windows and a red-brick lower façade, set against a backdrop of a blue sky with white clouds. The Halifax Regional School Board maintains the expansive open walkway and manicured greenery in the foreground.

Halifax Regional School Board

An energy conservation and retrofit project’s true success can be gauged when the impact it has on the world doesn’t begin and end with the immediate impact of the retrofits in the facilities, but extends to our collective cultural values and habits. That’s why MCW is particularly proud of our Energy Performance Contract with the…