Metrolinx/GO Transit

Metrolinx/GO Transit

The GO Whitby Parking Structure is located at the East lot of GO Transit’s Whitby Station.  The 4-level parking structure provides a total of 1,392 parking spaces for GO patrons.   The project was a design / build effort.  The superstructure for the garage includes 4 levels of exposed aggregate pre-cast elements, a feature stair…

Metrolinx/GO Transit

Metrolinx/GO Transit

This is a design/build project of four (4) levels parking structure with approximately 800 parking spaces.  This is the first multi-level parking structure for GO Transit.  The structure has provision for two (2) levels of future vertical expansion.

Toronto Parking Authority

Toronto Parking Authority

This is a 450-car above grade facility expandable to 660 cars completed for the Parking Authority of Toronto. The garage straddles the existing Yonge Street subway line, which cuts diagonally across the site.  In order to minimize the impact of the subway structure on the functional planning of the garage, it was necessary to minimize…