Address (Map): 150 Newport Dr, Port Moody, British Columbia V3H5C3 Canada
Sector: Institutional
Delivery Type: Design-Bid-Build
MCW Office: Vancouver
Status: Complete
Sub Categories: Fire Stations
Mechanical:
MCW Consultants
Electrical:
MCW Consultants
Architect:
Chernoff Thompson Architects
Contractor:
Kinetic Construction
Project Description
This new fire hall accommodates up to seven personnel, and features administration, on-call and training facilities and a vintage truck exhibit. Upper floors facilitate offices and administration space. Two sets of high-bay parking areas accommodate a total of seven trucks. The structure was built to meet Post-Disaster seismic standards in accordance with the BC Building Code.
Mechanical Systems Description:
MCW provided mechanical designs, including HVAC and air distribution, radiant floor heating in the vehicle garage, vehicle, kitchen and washroom exhaust, plumbing, and electric heating.
Electrical Systems Description:
MCW provided electrical designs, including distribution, base building fire alarm and emergency power, power and lighting, and conduit raceway and communications cabling systems.